This project will involve the replacement of the existing 48 Avenue roadway bridge across Mirror Lake, which was originally installed in the late 1940’s and has reached the end of its useful life. Further, computer modelling undertaken during the City’s most recent Transportation Master Plan update has indicated that the capacity of the structure may need to be increased to meet traffic demands over the next 20+ years. The City has retained AMEC Environment & Infrastructure to assist with the design and construction management components of this project.  Depending on the ultimate design of the replaced bridge, this work is anticipated to take place over the majority of 2016, during which time motorists are expected to experience significant delays along 48 Avenue between 51 Street and 53 Street.

Schedule Contractor
Anticipated 2016 AMEC