Grand Dr. Overlay (48 Ave to 58 St)

Pavement overlay was initiated based on recommendations from the Tetra Tech pavement study and as a result of the roadway surface deterioration. This pavement condition has necessitated the “milling/grinding” off a layer of the existing surface and a paving overlay of this section of roadway.

Schedule Contractor
Completed - July 2016 Border Paving Ltd.