Roadway Re-construction of 54 Street

(47-48 Avenue)

Partially Funded by:

Infrastructure Canada Alberta Program

Project Profile:

The 2003 City of Camrose Capital Budget includes the roadway reconstruction of 54th Street between 47th and 48th Avenues. 

The water main, and water and sewer service replacements were completed on this block last fall. We allow at least one freeze thaw cycle to assist in the trench settlements before constructing roadway surface improvements.

The roadway project involves the excavation of the existing road base and backfill with road base gravel (completed last fall). The 2003 work involves the installation of new concrete curbs and sidewalks, asphalt paving and boulevard sod work.

The City hosted an open house for residents on 54th Street in 2002. Discussion involved the local improvement costs, project schedule and obtaining input from property owners about existing problems such as drainage, access issues during construction, etc.

54th Street will be closed to vehicle traffic during construction. Fortunately lanes provide an alternative access in these areas.

 

  

Engineering

Design and site supervision of this project will be conducted by the City Engineering Department.

Contractor

Border Paving Ltd. and Branco Concrete were awarded the contracts for this project.

Budget and Funding

Total Project Cost $145,000.00
City of Camrose Contribution     $1,500.00
Local Improvement Costs   $59,600.00
Infrastructure Canada Alberta Program   $83,900.00
 

 

Schedule

54 Street South54 Street South
Existing sidewalk, curb and gutter and boulevard have been removed.Pouring new sidewalk on west side of 54 Street.
54 Street South54 Street South
Sidewalk, sidewalk tie-ins and curb and gutter have been completed.Residential paving following roadway reconstruction.
54 Street South
Roller compacting the asphalt.

Paving completed by the end of September.

Public Notice

For More Information Contact the Engineering Department at 672-4428.

  Home  Search  Index  Feedback  Privacy and Condition of Use StatementWe welcome your feedback
Updated February 4, 2005