![]() |
41 Street to 36 Street Last Modified September 23, 2005 Project Profile: The Sewer Master Plan study concluded that the industrial land on the east side of Camrose will need to be serviced through the existing (Mohler/Olstead) industrial area. The analysis indicates that the existing trunks through this area will be overloaded once development occurs further east. With the pending development of the Camrose East area a trunk sewer main extension along 44 Avenue from 41 Street is required this year. The Sewer Main Extension project involves the installation of a 600mm diameter trunk sewer along 44th Avenue from 41 Street east to Highway 13. ![]() Engineering: The design and site supervision of this project will be conducted by the City Engineering Department and Associated Engineering. Contractor: Central Oilfield Services Inc. has been awarded the contract for this project. Budget and Funding: The total project budget is $500,000 with funding from City reserves (off site levy). Schedule: Installation of trunk sewer completed between 36 Street and 41 Street. Restoration / landscaping completed by mid September. Photos:
Public Notice: For More Information Contact the Engineering Department at 672-4428. |
Copyright © 2007 The City of Camrose
TM "The Rose City" and design is a Trademark the property of The City of Camrose
Copyright and Disclaimer | Conditions of Use and Privacy Statement