Camrose East

Commercial Development

Last Modified December 16, 2005

Project Profile:

The east entrance to the City of Camrose along Highway 13 is in for some exciting changes this summer.

The Camrose Lodge & Casino is a first class 80 room hotel, convention centre, water park and Casino to be constructed on the south west corner of Junction of Hyw 13 & Exhibition Drive. This world class facility will provide Camrose with the ability to host larger conventions as well as being a destination tourist attraction for people from all parts of Alberta & Saskatchewan.

As a result of this development, 26 additional commercial lots will be available for sale, many have already been sold. Included with these lots will be 5 large properties along Highway 13.

Watch for further updates.

Engineering:

The design and site supervision of this project will be conducted by the City Engineering Department.

Contractor:

Central Oilfield Inc. was awarded the topsoil and underground contracts for this project.

Budget and Funding:

The project is estimated to cost $7,500,000

Schedule:

  • Topsoil removal completed by late September.
  • Deep underground completed by early November.
  • Roadway improvements were completed by late September and involved excavation and compaction of the road base and placing of 3/4 of the gravel (in order to accomodate future curb installation.
  • Shallow utilities completed by the end of December.
  • Completion of roads scheduled for 2006 (includes installation of concrete curb and gutter, paving and ditch backfill).

Photos:

Track hoe stripping the topsoil.Track hoe loading topsoil into truck to be stockpiled at another location.
Excavation for service installation.Valve and manhole installed at the intersecton of 36 Street and 47 Avenue.
Coring of road for roadway improvements.Installation of geotextile fabric.
Placing of gravel to form road base.Completed gravel road base.
Excavation in preparation for main installation.Installation of sewer main.
Backfill over newly installed sewer main.

Public Notice:

For More Information Contact the Engineering Department at 672-4428.

  Home  Search  Index  Feedback  Privacy and Condition of Use StatementWe welcome your feedback
Updated December 16, 2005

Copyright © 2007 The City of Camrose
TM "The Rose City" and design is a Trademark the property of The City of Camrose

Copyright and Disclaimer | Conditions of Use and Privacy Statement