Main Street Lane Reconstruction East & West of 50th Street (48 to 51 Avenue)
Last Modified Sep 2, 08
Project Profile:
The 2008 City of Camrose Capital Budget includes the lane reconstruction on the east & west sides of 50th
Street north of 48 Avenue.
The City of Camrose will host an open house for abutting property owners and area businesses to gather input on
the lane design, as well as to provide input on drainage and access issues during the proposed construction.
This local improvement project will be staged over the next few years to minimize disruption to area businesses.
We will attempt to address the worst lanes first.
The proposed reconstruction of the laneways will involve:
- Salvage of the existing roadway pavements and gravel structure.
- Lowering / upgrading of existing shallow buried facilities.
- Excavation of the road base to provide for the placement of granular structure
- Asphalt Paving (two separate placements of asphalt, to a total depth of 125mm)
Engineering:
The design and site supervision of this project will be conducted by the City Engineering
Department.
Contractor:
Border Paving Ltd. has been awarded the contract for this project.
Budget and Funding:
This project is estimated to cost $100,000.
Schedule:
The local improvement bylaw is going for third reading on September 8.
The first phase of this project is scheduled for the fall of 2008.
Public Notice:
For more information contact the Engineering Department at 672-4428.
|